Real challenges from substations, manufacturers and control-panel builders — and the outcomes our platforms delivered against them.

Manufacturing plantSwitchology

Turning raw meter data into a 20% lower energy bill

A mid-size manufacturer was paying for energy it couldn't see. Switchology gave the plant real-time visibility and automated the response.

The challenge

Consumption was billed monthly with no breakdown by line or shift, so waste stayed invisible and there was no way to prove where savings could come from.

The solution

Switchology captured hundreds of data points per second from the plant's meters, analysed consumption patterns, and drove smart relay automation to shed avoidable load — with insights the team could act on.

20%
lower energy cost
100s/s
data points captured
24/7
automated monitoring
Explore Switchology
Control-panel OEMSwitchonomy

Halving quotation time and doubling won bids

A control-panel manufacturer was losing bids to slow, manual estimation. Switchonomy made accurate quotes fast enough to win.

The challenge

Every quotation meant hand-building a bill of material and pricing it from scattered supplier lists — days of work per bid, with pricing that drifted out of date.

The solution

Switchonomy produced accurate quotations and bills of material from 12,000+ live component prices, so the team could turn complex enquiries around in hours instead of days.

50%
faster estimations
increase in orders won
12,000+
live prices referenced
Explore Switchonomy
Substation & switchgear projectStellar Panels

Cutting panel design time by 75% on an HT/LT build

A switchgear project needed HT, LT and RMU panels designed, drawn and costed fast. Stellar Panels compressed the whole flow.

The challenge

GA drawings, single-line diagrams and cost estimates were produced separately by hand, so a change in one meant reworking the others and slowed the whole build.

The solution

Stellar Panels let the team design panels to the SLD, auto-generate GA drawings and single-line diagrams, and produce accurate estimations in one streamlined online flow — then delivered factory-tested panels.

75%
less time in design
1
flow from design to BOM
100%
factory-tested on delivery
Explore Stellar Panels
Construction & EPC firmVendorstocks

Sourcing genuine parts with live stock and traceability

An EPC contractor needed authentic components on time, with proof of origin. Vendorstocks connected them to authorized supply.

The challenge

Procurement meant chasing multiple vendors with no reliable view of stock or authenticity, risking delays and counterfeit parts on live sites.

The solution

Vendorstocks gave the firm a B2B marketplace with live inventory, authorized supply lines — including Degson connectors and C&S Electric switchgear — and full traceability on every order.

Live
stock visibility
100%
authorized, traceable parts
2
authorized supply lines
Explore Vendorstocks

Start here

Let's energize your next project.

Tell us what you're estimating, designing or running. We'll point you at the right tool — or sit down and work it through with you.